The mortar should be heated at low tempreture in a suitable Kettle by stirring with metal rod or ladle. The surface shall be laid first with membrane. Over the dry coat of membrane, the chemical resistant bricks or tiles be placed on spacer chips. Melted Sulphomor Mortar shall bepoured through joints of bricks or tiles. In case of vertical surface joints of bricks or tiles are covered by applying with adhesive paper. Sulphomor Mortar is poured between the wall surface and the tile or bricks. Please ensure that no water shall be spilled over the bricks lining works before it completely cured.
Surface Preparation:

The cement plastered surface shall be slightly rough in line & level, dry
clean, free from dust, dirt, grease, oil etc., maintaining required slope
can be adjusted or altered in Acid proof lining works.